Head Office/Devon 01626 331771         Essex 01279 293297         Manchester 0161 327 2002         Message         Facebook         Twitter
 
 
HFS
 
 
APJ Asphaltic Bridge Joint Replacement In London
Posted by Carrie Packer on Wed 28th June 2017
 
Working for a Tier 1 contractor on behalf of Highways England, a skilled crew have been working on APJ Bridge Joints, also known as Asphaltic Plug Joints on a motorway route near London.
APJ's are the traditional solution to the dynamic end of a bridge and a significant factor in the life expectancy.

With a huge amount of experience in the replacement of plug joints we despatched a crew from our Harlow depot. On this occasion, our crew were on-site to reinstate a four metre length of existing joint. The nature of the traffic levels on the highway means that to minimise disruption and ensure safety of both motorists and our crew, this type of work tends to take place overnight as it did on this occasion.

This is a diagram of what an APJ would look like if it was cut through: LMS Highways offer refurbishment of existing bridge joints, including repairs to bridge joints following resurfacing works. We also offer a replacement service for failed joints either like for like, or replacing with a Nosing Joint, which for a small increase in cost gives a greater lifespan and requires less maintenance.

We use only the highest quality, durable materials which offer a maintenance-free operation.

More details can be found here. For advice and quotes, please contact us on 01626 331771.
 
LATEST FROM LMS
LMS Highways News Story -
18 months of success for the LMS Civil Solutions team
Nov 2017 Just under 2 years ago, the Directors of LMS Highways started to investigate wider opportunities available as a natural extension of their popular and respected highway repair solutions.
Consistently great performance from LMS Highways crews...
Rating Stars
4.9 / 5
* Unedited average ratings from last three months.
Last updated 18/11/17 18:03.
MORE NEWS
LMS Highways News Story -
HFS, Imprint & Line Marking in Exeter
Sep 2017 LMS Highways Kerb to Kerb service offers one stop accountability and savings on traffic calming project near Exeter.
LMS Highways News Story -
Motorway savings made using 'Kerb to Kerb' solutions.
Sep 2017 A-one+ successfully kept the M180 flowing with LMS Highways' unique services to deliver time and budgetary savings.
LMS Highways News Story -
MMAX Joint Repair Extruder celebrates 5 year anniversary!
Jul 2017 Our amazing MMAX joint repair extruder has been operating across the UK for 5 years and we thought we'd celebrate with a reminder of how revolutionary the award-winning MMAX continues to be.
 
We're accredited and qualified to handle the job...
Every day we deliver great work for amazing customers...
P=APJ Asphaltic Bridge Joint Replacement In London